All industries
Water & Wastewater
LiveTreatment trains, biosolids, pumping & distribution
Compare facility-planning alternatives — CAS vs MBR vs SBR, conventional vs membrane drinking water, biosolids pathways — on environmental impact alongside cost. 150+ ready-to-run unit processes.
Functional unit
per m³ treated
LCIA method
TRACI 2.1 + IPCC AR6 GWP
GHG + criteria pollutants
GWP, acidification, eutrophication, smog, PM
What you get
- Pre-built, literature-sourced templates with sensible defaults
- Full customization of every driver, with typical-range warnings
- Scenario comparison, sensitivity analysis, and cost/NPV
- Beautiful charts + one-click Excel and PDF reports
- Reproducible, version-pinned reference data
Data sources
- EPA TRACI 2.1
- IPCC AR6
- eGRID 2024
- Federal LCA Commons
- IPCC 2019 wastewater
Planning-grade results — not third-party-reviewed per ISO 14044. See the scope-of-use disclaimer.
One-click starter projects
Skip the blank page. Each starter builds a fully-populated, auto-calculated, cited project — a single scenario or a ready-made A/B comparison — that opens with results already computed. Sign up free to launch one.
Compare
5-MGD WWTP
CAS vs MBR alternatives
Compare
10-MGD DW retrofit
Conventional vs UF + RO membrane
Compare
Biosolids pathways
Land app vs incinerate vs pyrolysis
Compare
Disinfection trade-off
Chlorine vs UV vs ozone per m³
Compare
Secondary bake-off
CAS vs MBR vs MBBR vs ox-ditch per m³
Compare
Water reuse: MBR vs DPR
Reclaimed-water MBR vs full advanced treatment per m³
Small DW plant
1-MGD conventional drinking-water baseline
Compare
PFAS removal
GAC vs ion exchange vs RO per m³
Compare
Desalination: BWRO vs SWRO
Brackish vs seawater RO per m³
Compare
Dewatering choice
Belt press vs centrifuge vs screw press
